A phase monitoring relay should be selected for the supply system, the faults it must detect and the required response after a fault clears. Phase loss, incorrect sequence, undervoltage and voltage unbalance are different conditions; a device described simply as a three-phase relay may not cover all of them. Confirm the exact variant and its measurement method before setting thresholds. This guide uses Asiaon’s ASP18 three-phase voltage relay family to explain the selection process, including how to distinguish supply monitoring from motor overload protection and how to document a useful commissioning test.
Product reference: ASP18 product specifications and drawings.
Start with the problem the monitor must detect
Write down the events that the application needs to recognize. A missing supply phase is not the same event as all three phases falling below the permitted operating voltage. Incorrect phase sequence is another separate condition. Voltage unbalance concerns differences among phases, and the calculation used to describe it must be understood before a threshold is interpreted.
Consider the consequences for the connected equipment. A pump installation may need to prevent an unintended rotation sequence, while another process is concerned about continued operation under poor supply conditions. These are application requirements, not automatic capabilities of every monitor. Identify which faults should inhibit starting, which should stop an operating machine and which should generate an alarm.
Record whether automatic restart is permitted after the supply recovers. A monitor’s output returning to normal can create a start permission, but the overall equipment should determine whether another operator command is required. Resolve that sequence before installing the relay so that recovery from a supply fault does not create unexpected movement.
Match the monitor to the actual supply arrangement
Confirm nominal voltage, frequency and whether the system uses three wires or four wires with a neutral. Line-to-line and line-to-neutral measurements are different quantities. A device intended to measure one arrangement should not be selected from a similar numerical voltage range without checking how it is connected and supplied.
The ASP18 product page lists multiple supply arrangements and functional variants. Its table distinguishes three-phase three-wire and three-phase four-wire configurations. Select the exact combination and obtain the matching wiring diagram. Do not treat the family heading as a statement that every order code can be connected to every listed supply.
Also establish where the monitor receives power and where it measures voltage. These may be related but should be explicitly documented. A missing phase or neutral can affect the monitor itself as well as the equipment. Understand the expected output state when the monitor loses the supply needed for its own operation.
Distinguish the monitored fault categories
Phase sequence describes the order of the three phases. A sequence-sensitive application needs the correct arrangement at the equipment, but a monitor does not replace checking the completed installation. Wiring changes downstream of the monitoring point can alter what the motor receives without changing the sequence observed at that point.
Phase loss means that a phase condition is absent or outside the device’s detection criteria. Detection can depend on the relay design and connected system. Avoid assuming that every possible downstream fault will be detected by a monitor located upstream. Choose the measurement location and protection arrangement to cover the intended failure modes.
Overvoltage and undervoltage compare measured quantities with defined limits. Voltage unbalance evaluates differences among the phases according to a stated method. An apparently reasonable threshold is meaningless if the engineer assumes one calculation while the device uses another. Ask for the definition, measurement reference and timing behavior in the selected product documentation.
Use a function-by-function selection table
| Review item | Evidence to request | Approval action |
|---|---|---|
| Phase loss | Detection criteria and sensing location | Identify faults downstream that may not be observed |
| Phase sequence | Required rotation sequence | Check wiring at the actual load |
| Over/undervoltage | Measurement basis and available limits | Confirm line-to-line or line-to-neutral values |
| Unbalance | Definition and available threshold | Do not mix calculation methods |
| Delay | Which transition the setting affects | Distinguish trip, start and recovery |
| Output/recovery | Healthy state and reset sequence | Confirm the equipment restart policy |
Basis: application review questions and the linked Asiaon product documentation; no additional product ratings are implied.
The ASP18 family information contains variants with different combinations of voltage, asymmetry and timing functions. Use this table to ask the right questions, then confirm the selected model’s capabilities in writing. Do not transfer an adjustable range from one row of a family table to another version.
Calculate voltage unbalance only with a stated definition
One common magnitude-based calculation, discussed in U.S. Department of Energy motor guidance, expresses voltage unbalance as the maximum deviation from the average line voltage divided by that average, multiplied by one hundred. This is useful for a clearly labeled example, but it must not be assumed to equal every relay’s internal measurement method or a sequence-component calculation.
For example, suppose three measured line-to-line voltages are 398 V, 400 V and 402 V. Their average is 400 V. The largest deviation from that average is 2 V, so the calculation gives 100 × 2 ÷ 400 = 0.5 percent. All input measurements use the same voltage basis and appropriate measurement conditions. Mixing line-to-line and line-to-neutral readings would invalidate the result.
This example demonstrates arithmetic; it does not prescribe a trip setting or declare the system suitable for a particular motor. Compare the result with the motor manufacturer’s requirements, the applicable design rules and the monitor’s documented method. A single reading also does not describe supply behavior throughout a production cycle.
Set delay and recovery behavior deliberately
A delay can distinguish a brief disturbance from a condition that requires action, but adding delay also allows the equipment to remain exposed for longer. Choose it from the equipment’s tolerance and process requirements. Do not increase it simply to silence repeated trips before finding out what causes them.
Separate the delay before starting, the delay before a fault output changes and any delay before recovery. A product may implement only some of these behaviors. Confirm which setting affects which transition, and whether different fault categories share the same response. A commissioning record should identify the function being timed, not just write down a number of seconds.
Hysteresis or recovery thresholds can help avoid repeated switching near a boundary. Their behavior must be understood alongside the trip threshold. After a fault clears, establish whether the output returns automatically and what the wider control system does with that return. The final sequence should remain intentional during intermittent supply problems.

The ASV18 single-phase voltage relay illustrates a different monitoring category. It can be a relevant reference when a project also has single-phase circuits, but it must not be mistaken for a three-phase sequence monitor. Select the monitoring function before comparing enclosure size.
Keep voltage monitoring separate from motor overload protection
A voltage monitor observes specified electrical supply conditions. It does not automatically measure motor winding temperature, phase current, mechanical load or all faults in the power circuit. A motor protection scheme may require overload protection, short-circuit protection and other measures in addition to voltage monitoring.
The Department of Energy motor guidance explains that voltage unbalance can contribute to heating and impaired motor operation. That supports investigating supply quality, but it does not turn a voltage relay into a complete motor protection system. Review each protection function and the point in the circuit where it acts.
The monitor’s output contact is also not automatically the device that should interrupt motor power. It may provide an input to the control system or operate a properly selected switching device. Confirm the output’s applicable duty and the receiving circuit’s requirements. Never assume a headline output current authorizes direct switching of a motor of the same running current.

The ASC18 current relay family monitors a different quantity from the ASP18 voltage relay. The product photo helps distinguish these neighboring categories. Whether current monitoring is needed, and how it fits with overload protection, depends on the equipment’s complete protection design.
Place the monitoring point where it answers the question
Decide whether the goal is to monitor incoming supply, a distribution branch or conditions close to a particular load. An upstream monitor cannot necessarily observe a fault occurring after its sensing connections. Conversely, a monitor at one motor does not describe every branch in a larger installation.
Consider measurement wiring, protective arrangements and the manufacturer’s permitted connection method. Follow the approved electrical design and local requirements. Where voltage measurements or fault simulations are needed, use qualified personnel and suitable equipment. Do not create an uncontrolled open-phase condition on an operating machine merely to demonstrate that an indicator changes.
Document the monitoring point on the circuit drawing. Include how the output reaches the control system and what state is considered healthy. That information helps maintenance staff distinguish a supply problem from a monitor wiring fault or an unrelated control interlock.
Commission with documented fault and recovery cases
First check the delivered order code, supply arrangement, wiring and settings against the approved design. Establish a baseline under normal conditions and record the measured values. Verify the expected indication and output state. A visible healthy LED is helpful but should not be the only acceptance criterion.
Use an approved test arrangement to check each required function and the corresponding control response. Record the applied condition, relay indication, output state, response time and recovery sequence. Test the equipment’s response to monitor power loss and to restoration of normal supply. If automatic restarting is prohibited, confirm that the overall control circuit prevents it.
Preserve the final settings and test results with the equipment documentation. When recurring trips occur, compare measured conditions with that baseline before replacing the monitor or relaxing thresholds. The symptom can originate in the supply, connections, settings, sensing location or control circuit.
Frequently asked questions
Does every phase monitor detect voltage unbalance?
No. Check the exact variant’s functional table and definition of asymmetry or unbalance. A phase-loss and sequence device may not provide the adjustable unbalance function the project needs.
Is a voltage monitor a replacement for an overload relay?
No. Voltage and current-related protection address different conditions. The complete motor protection design determines which devices and functions are required.
Can the example 0.5 percent value be used as a trip setting?
No. It is an arithmetic example. The correct setting depends on equipment requirements, the measurement method and the protection design.
Why does the motor not restart when the supply returns?
The control circuit may intentionally require a new start command or another interlock may remain open. Check the documented recovery sequence rather than assuming the phase monitor has failed.
Further technical context: the U.S. Department of Energy Motor Repair Tech Brief discusses supply anomalies, repeated starts and thermal stresses affecting motor reliability.
Electrical servicing reference: 29 CFR 1910.333 electrical work practices, Cornell Legal Information Institute. Use the rules and approved procedures applicable to the installation; the relay is not a substitute for verified isolation.
Video: the operating principle behind the checks
NPTEL IIT Kharagpur introduces three-phase induction motor starting. This provides motor-operation background for the monitoring and control discussion, not ASP18 setting instructions.
Watch Lecture 57: Starting of 3 Phase Induction Motor – Introduction on YouTube
Continue planning the relay assembly
For a broader starting point, use our general-purpose relay selection guide. Review latching versus non-latching operation when defining the required state after control power changes, and our overview of general-purpose relay applications and advantages for the role of the control interface.





