Relay operate time and release time describe intervals between a defined coil event and a defined contact event. They do not automatically describe the time until a machine stops, a PLC accepts an input, or every contact becomes stable. Before selecting a replacement, establish which contact is observed, whether bounce is excluded, and which coil voltage, temperature and suppression circuit apply. A useful timing requirement names both endpoints and the operating conditions. This guide explains how to turn a catalogue timing entry into a practical verification plan without treating a general-purpose relay as a complete safety function.
Start with the contact event that matters
A relay can have normally open contacts, normally closed contacts, or changeover contacts. The relevant endpoint may be closure of a normally open path, opening of that path, or restoration of a normally closed path. Those events are related, but they are not interchangeable. A changeover contact also passes through a transfer interval; measuring one terminal pair does not establish the timing of the other pair.
For a multipole device, identify the particular pole and whether the requirement applies to the earliest event or the last required event. A measurement on an accessible spare pole can be useful for diagnosis, but it should not silently become evidence for an unmeasured load pole. Put the terminal identifiers on the test record and retain the approved connection drawing alongside the waveform.
The IEC 63522-8 timing standard addresses relay timing tests when required by a detail specification. Its public description establishes the subject and purpose of the standard; it does not provide a universal timing limit for every industrial relay. Request the applicable product specification and agreed test conditions rather than borrowing limits from a different relay family.
Read the catalogue entry with its conditions
The AS36FE industrial relay page lists an operate/release entry of no more than 15 ms/15 ms. That is a published product-page entry, not permission to assume that every installed assembly will respond within 15 milliseconds. The ordered coil, contact arrangement, applicable conditions and treatment of bounce still need confirmation. Socket accessories and external electronics can also change the installed response.
Separate a maximum specification from a typical measurement. A sample that operates quickly on the bench does not improve the published guarantee. Conversely, an installed result that appears slower deserves investigation before the relay is declared defective: the trigger may have been taken at the controller command instead of the coil terminals, or the endpoint may include filtering and load behavior.
For procurement, retain the document revision and full order code with the timing requirement. If a supplier proposes a substitution, compare the event definitions first. Comparing two numbers without comparing their definitions can produce a false impression that the substitute is faster or slower.
Use a timing review table before connecting instruments
The following table is a project planning aid. It sets out the evidence needed to compare measurements; it does not introduce new product ratings or substitute for a manufacturer’s test method.
| Review item | Evidence to record | Acceptance action |
|---|---|---|
| Start event | Coil terminal transition or controller command | Choose one and record its threshold |
| End event | Specific contact and first or stable transition | Use the required endpoint consistently |
| Suppression | Exact relay, driver and accessory circuit | Test the installed arrangement |
| Conditions | Coil supply, temperature and duty | Use agreed limits and evidence |
| System budget | Consecutive controller, relay and receiver intervals | Avoid overlapping or missing delays |
| Record | Raw waveforms, instrument and drawing | Retain a repeatable acceptance package |
A complete record should allow a second technician to repeat the test without asking what the original operator meant by “relay on.” If the waveform is labelled only with channel numbers and a cursor difference, add the circuit drawing, channel descriptions and event thresholds before accepting it as evidence.
Separate first contact movement from stable switching
Mechanical contacts can change state more than once during a switching event. The first transition and the end of contact bounce therefore answer different questions. A fast first closure can still be followed by a period during which a digital input sees several transitions. Increasing a software filter may solve the input problem while extending the system’s accepted response time.
An oscilloscope trace should make the chosen endpoint visible. Record whether the cursor marks first closure, final stable closure, first opening or a specified receiving-circuit threshold. Keep the raw capture so the endpoint can be reviewed later. Avoid smoothing or averaging settings that hide the very discontinuities the test is intended to observe.
This distinction is especially useful when a relay drives a counter or a controller input. The mechanical event, electrical contact signal and accepted software state are separate observations. A requirement for one clean count belongs to the complete input arrangement, including filtering, rather than to a contact timing number alone.
Measure at the coil instead of assuming command timing
The controller command can precede the actual coil voltage transition. Output electronics, cable impedance and shared supply loading may contribute delay or alter the voltage available at the relay. Monitor the coil terminals when the test definition requires coil energization or de-energization as the starting event. Observe the controller command on an additional channel if system diagnosis also matters.
For a DC coil, the current waveform can help distinguish a supply problem from a delayed mechanical response. Any current probe or series measurement method must be appropriate for the circuit and must not disturb operation enough to invalidate the result. A resistor inserted casually into the coil supply can change the condition being measured.
The AS13FW relay family provides another documented industrial relay option. Compare its exact coil and contact configuration with the application, rather than using the photograph or family name as proof of timing equivalence. The page contains multiple configurations; resolve the ordered version with Asiaon before approving a substitute.

Keep the installed suppression in the timing test
A coil suppression arrangement controls the voltage generated when coil current is interrupted. That arrangement can also affect current decay and therefore the release behavior. Test the approved driver, suppression device and relay together. A bare-relay bench test cannot establish the release time of an assembly using a different socket module or controller output.
The National MagLab’s solenoid tutorial provides educational background on electromagnetic actuation. Use such material to understand the mechanism, while obtaining the installed circuit limits from the actual component documentation. Do not remove a protective device merely to make a timing trace look faster.
If a suppression component changes during maintenance, repeat the relevant timing verification. Record its part number and location, including whether it is built into the relay, fitted to the socket, or located at the controller. A polarity-sensitive accessory also requires the correct coil connection. Similar-looking replacement modules can have different effects.
Build a system response budget separately
Consider a hypothetical monitoring circuit in which a controller output delay is budgeted at 6 ms, the relay contact response at 18 ms, and the receiving input filter at 12 ms. The serial budget is 6 + 18 + 12 = 36 ms. These numbers are an illustration, not Asiaon ratings. They can be added only if the intervals are defined as consecutive and do not overlap.
If the requirement is measured from a physical sensor event, include the sensor and controller processing as well. If the endpoint is removal of actuator force, the electrical contact event may occur well before the final physical result. Specify the complete chain, identify where each limit comes from and reserve margin for measurement uncertainty and operating variation.
General-purpose relay selection does not establish a safety-rated stopping function. Where safety performance is required, the complete architecture, diagnostics, component suitability and validation must follow the applicable project requirements. Do not turn a timing calculation into an unsupported safety claim.
Plan conditions and measurement uncertainty
Define a test matrix before collecting samples. Relevant conditions may include the permitted coil supply range, the expected ambient range and the approved duty cycle. Decide which conditions require measurement and which are supported by supplier evidence. Avoid inventing a sample count or acceptance percentile after looking at favorable results.
Use a timebase and acquisition setup suitable for the interval under review. Trigger thresholds, channel delays and probe arrangement matter when the available margin is small. Record the instrument, acquisition settings and calibration status as required by the project’s measurement process. If the uncertainty consumes the available margin, improve the method or review the design rather than reporting more decimal places.
Keep load switching and measurement safety in the plan. The US electrical work requirements in 29 CFR 1910.333 address work practices around electrical equipment. Measurements on energized circuits require appropriate personnel and procedures. A grounded oscilloscope lead must not be attached to an arbitrary live point; use a suitably rated measurement arrangement.
Record a useful replacement acceptance package
A replacement package should contain the original and proposed full order codes, the approved contact drawing, coil supply details and suppression arrangement. Add the required timing endpoint, environmental conditions and the reason timing matters in the process. This lets the supplier assess a meaningful requirement rather than an unexplained request for a “fast relay.”
The AS36FW industrial relay can be reviewed as a separate product family with its own documentation. Its visible indicator and test features do not prove that the load contacts meet a particular system response requirement. Confirm the exact configuration, then evaluate the assembled circuit against the recorded acceptance criteria.

When a test fails, retain both the command and coil observations. A late controller output, a supply sag, an unexpected suppressor and a mechanical delay lead to different corrective actions. Replacing the relay before locating the delayed interval can leave the original fault in place. After correction, repeat the affected condition and preserve the before-and-after captures.
Frequently asked questions
Does release time include contact bounce?
Do not assume that it does. Confirm the definition in the applicable product specification and identify the measured contact event. If the application requires a stable signal, measure that additional endpoint explicitly and include receiving-circuit filtering in the system assessment.
Can I compare timing values from different relay families directly?
Only after checking the contact event, coil conditions, suppression and specification basis. A typical value and a guaranteed maximum are different evidence. Similar housing size, pin count or current rating does not establish an equivalent timing definition.
Is the relay timing entry the machine stopping time?
No. Machine response can also include sensing, controller processing, output electronics, input filtering and actuator behavior. Establish the complete response chain and validate the required physical endpoint under the application’s conditions.
Video: measurement and circuit background
Khan Academy explains magnetic fields in solenoids. This introduces electromagnetic actuation, not a timing specification or relay test procedure.
Watch Magnetic fields through solenoids on YouTube
Related relay planning guides
For control component fundamentals, start with our general-purpose relay selection guide. Continue with coil suppression and release behavior, and contact bounce diagnosis.