A conductive liquid level relay can detect a wet electrode only when the liquid and the installed sensing path fall within the controller’s documented operating conditions. Water type, dissolved substances, temperature, electrode condition and installation geometry all matter. Do not assume that a controller suitable for ordinary process water will detect purified water, oil or every cleaning solution. Confirm the sensing principle and the supported liquid conditions for the exact model before choosing probes or setting sensitivity.
This guide focuses on that compatibility decision. Filling and draining logic is a separate question: the circuit can have the correct output sequence yet still fail to recognize a wet probe reliably.
Start with the sensing principle, not the tank label
A conductive system responds to an electrical path through the liquid between designated sensing electrodes. This differs from a float switch, a pressure transmitter or a capacitive sensor. A product described simply as a liquid level controller does not establish which sensor can be connected. Request the wiring instructions and probe requirements for the exact ordered version before purchasing an electrode assembly.
The Asiaon ASL18 liquid level relay page identifies level-control functions and provides function and wiring drawings. Use that page to begin a technical inquiry. Do not infer a universal conductivity range, probe material, sensing voltage or cable allowance from the product photograph. Those details must come from the applicable instructions or a written confirmation for the proposed installation.
Conductivity is a property of the liquid, not just a synonym for water
The USGS explanation of conductivity and water describes how dissolved ions allow water to conduct electricity. Purification can substantially change that behavior. Consequently, a tank that switches from utility water to purified rinse water may present a different sensing duty even if its level, temperature and pipework appear unchanged.
Do not use a generic water description as the only process input. Ask the operator what liquids are present during production, rinsing, cleaning and startup. Keep representative samples or process measurements where the project requires them. A liquid label such as “clean water” is too broad to establish compatibility with an unidentified controller and electrode arrangement.
A conductivity measurement is useful process information, but it is not the same thing as the resistance the controller sees through the installed electrode circuit. Probe spacing, immersion and the return path belong in the installation review. Avoid converting a measured conductivity into a controller adjustment by assuming an electrode geometry that has never been established.
Assemble a liquid and operating-condition record
Describe the liquid across the expected operating cycle. Include composition or treatment, likely variation, temperature range, suspended material and cleaning chemicals. Ask whether the sensing point is exposed to foam, deposits, splashing or a remaining film after the tank drains. These observations help define a test plan; they are not proof that a particular sensitivity value will work.
If production conditions vary, identify the conditions most likely to make wet detection difficult and those most likely to make a dry probe appear connected. Review both with the controller supplier. Increasing sensitivity without considering the dry condition can exchange one failure mode for another. A useful acceptance record includes evidence of both transitions rather than one successful wet test.
Distinguish process sensing from the other pump-panel controls

The Asiaon ASV18 voltage monitoring relay is shown as a separate panel component. It monitors an electrical supply condition; it is not a substitute electrode interface. Keeping those functions distinct prevents an inquiry from treating every device with a relay output as the same kind of sensor controller.
Similarly, the output contact of a level relay may command another control device. Its presence does not prove that the relay can switch a particular pump motor directly. Review the downstream load, contact duty, protection and control architecture separately. A successful wet-probe indication validates only part of the signal chain, so the final test should also confirm the intended pump command and recovery behavior.
Use an installation checklist without inventing a threshold
The table below is an engineering information checklist, not a list of universal controller settings. For conductivity terminology and measurement context, see the USGS specific electrical conductance reference. Its water-measurement guidance does not establish a detection threshold or an approval for the ASL18.
| Review item | Evidence to record | Acceptance action |
|---|---|---|
| Liquid | Actual composition and process variation | Obtain supported sensing conditions |
| Controller | Sensing principle and exact order code | Do not infer probe compatibility from output type |
| Electrodes | Material, geometry, holder and return path | Follow the approved assembly instructions |
| Cable | Type, route, length and junctions | Use limits for the exact controller |
| Wet and dry | Representative states and acceptance criteria | Verify both transitions |
| Output chain | Command device and required process response | Check separately from probe detection |
The table deliberately asks for evidence rather than recommending a single resistance or conductivity value. Different sensing systems can use different methods and limits. If the available product documentation does not establish the required compatibility, keep that item open and request clarification rather than inventing a setting from another manufacturer’s instructions.
Check electrodes, holders and the intended return path
Record the electrode material, holder, number of probes, installed positions and connections. Confirm compatibility with the liquid and cleaning conditions through the relevant supplier documentation. Do not assume that a convenient piece of metal provides an acceptable sensing electrode or that every metal tank can be used as the return connection. The approved circuit determines the return path.
Review mechanical access as well as electrical compatibility. The installation should allow inspection and cleaning according to the equipment procedure. If deposits are expected, document how their effect will be checked during maintenance. A photograph of a clean new probe is a useful baseline, but it does not replace a service plan for an actual process liquid.
Do not shorten, extend or relocate probes without considering the control elevations and installed sensing conditions. Mark the physical levels on the drawing and define which transition each probe represents. This keeps a later mechanical change from silently changing the process decision while the electrical drawing still appears correct.
Treat cables and junctions as part of the sensing assembly
Obtain the permitted cable type, routing and length from the controller instructions. Record any junction boxes, shield arrangements and connections specified by that documentation. Avoid applying a cable limit from an unrelated controller merely because both use electrode probes. The installed cable is part of the system being evaluated, not an invisible extension outside the design.
If a fault occurs intermittently, record when it happens relative to other equipment operation, cleaning or weather exposure. Inspect the installation under the approved safe-work procedure. Do not change several settings and reroute wiring simultaneously if the purpose is to identify the cause. Controlled changes produce an explanation that maintenance can use again instead of a temporary result with no traceable reason.

The Asiaon ASP18 three-phase voltage relay represents a separate supply-monitoring function in a pump control project. The photograph is not an electrode or an ASL18 wiring example. A panel may need both process-level information and electrical supply supervision, but acceptance criteria should identify each function independently.
Commission wet and dry behavior under a written procedure
Before a process trial, define the conditions to be demonstrated, the permitted method of simulation and the acceptance criteria. Use only methods allowed by the equipment and controller instructions. Do not improvise shorts across unknown terminals or connect an external source to a sensing input. If a simulated probe condition is permitted, label it clearly and remove temporary equipment before returning the system to service.
Then confirm performance with the actual approved probe assembly and representative process conditions. Record the input state, indicated state, output response and recovery. Include a clean dry condition and the relevant wet condition; where the application warrants it, review residual films and expected contamination. Separate the detection result from any intentional output delay, so a timing choice is not mistaken for poor liquid sensitivity.
Define the response to a broken connection or loss of supply from the exact circuit documentation. The safe process response depends on the tank, pump and hazard assessment. Do not claim that every conductive level relay automatically stops a pump safely under every fault. Independent overflow or dry-run protection may be required by the system design, and must be evaluated as its own function.
Preserve a maintenance baseline and a purchasing record
After acceptance, retain the liquid description, probe arrangement, cable information, approved settings, drawing revision and observed transitions. Record the cleaning method and the inspection interval selected for the process. These records make it possible to distinguish a changed liquid from a damaged probe, altered cable or unauthorized adjustment when the system is serviced later.
For electrical access, follow the applicable isolation and verification procedure. The US workplace provisions at 29 CFR 1910.333 address safe work around electrical parts. Tank access and process hazards also require the facility’s procedures; an electrical control article does not authorize entry into a vessel or work on an operating installation.
An inquiry should state what remains unknown. Ask for confirmation of the sensing principle, supported liquid conditions, electrode requirements, cable restrictions and the exact order code. Attach the proposed drawing and process record. This gives the supplier a concrete application to review and avoids turning the broad phrase “water level relay” into an unsupported compatibility claim.
Frequently asked questions
Can a conductive level relay detect purified water?
Possibly, but only if the exact controller and installed electrode system support the actual liquid conditions. Purification can reduce conductivity, so ordinary-water experience does not prove reliable detection. Obtain documentation and verify the proposed installation with representative liquid.
Should sensitivity always be increased when a wet probe is not detected?
No. First confirm the sensing principle, liquid suitability, probe condition, return path and approved wiring. Any permitted adjustment must also preserve reliable dry detection. Record the result under the relevant wet and dry conditions instead of relying on one indicator change.
Can the pump panel use a voltage relay as the electrode controller?
A voltage monitoring relay performs a different function and should not be substituted for an electrode interface. Select the documented level-sensing equipment and evaluate supply monitoring and downstream pump switching as separate parts of the control system.
Video: measurement and circuit background
The Royal Society of Chemistry demonstrates how changing dissolved ions changes electrical conductivity. This laboratory lesson explains the sensing principle; it is not an industrial probe installation guide or a recommendation to reproduce the experiment in a process tank.
Related relay planning guides
For control component fundamentals, start with our general-purpose relay selection guide. Continue with Liquid Level Monitoring Relay: Filling, Draining and Fault Checks, and Phase Monitoring Relay Selection: Faults, Settings and Recovery.